Industry News

19 02, 2011

Novel Water Sink being Developed

By |February 19th, 2011|What's News|0 Comments

Novel water sink being developed over a one year research contract is tested and found to be 46% more efficient than 1st generation designs.

19 02, 2011

TECTEG Signs Second Contract with Horus Technology

By |February 19th, 2011|What's News|0 Comments

TECTEG signs second contract with Horus Technology to develop a Boost/Buck power board for load specific applications.

Specifically designed for thermoelectric power generation! Able to run 12 & 24 VDC devices. Optional Charging Bar for powering PDA’s, Laptop, DvD players, smart phones.

19 02, 2011

TECTEG Signs Contract with Horus Technology

By |February 19th, 2011|What's News|0 Comments

TECTEG signs contract with Horus Technology to develop novel Battery Charging Power Electronic Board specific to thermoelectric power technology to charge batteries.

X
Introducing the IPowertower™ fully integrated TEG Charging SYSTEM (all you add is water and fuel)
¤